Tips in taking hand-over of apartment/house
The most awaited stage of most apartment/house buyers is the hand-over date. After many difficulties, careful calculations in the selection of apartments, participating in the sale, installments, then patiently waiting until the date the developer notices the hand-over, to avoid inconvenience in this day, which is set with high expectations, let’s take a look at things to note when receiving the hand-over of an apartment/house.
There are at least 4 things to note when taking the hand-over of an apartment/house:
1/ Before receiving the hand-over: you need to pay all bills in full and contact the developer to make a specific appointment. It is very important to make an appointment because the developer must prepare the cleaning, select the personnel and engineers to come along to check all details and sign the related papers.
2/ On the day of hand-over: just take your time leisurely, step into the apartment/house you have chosen to enjoy, but remember to check the following details:
- Check every detail of the water source, turn on the faucets in the kitchen, bathroom to see if the drainage is leaking or the water is running weakly. In particular, carefully check whether the hot water system is working properly
- Turn on each light switch, turn on each air conditioner to see if everything is working properly
- Then, look at each wall, floor, door, stone surface to check if the painting is decent, the door is chipped or if the stone surface is cracked or not
- Open each door, check all kitchen doors, windows, closet doors to see if opening/closing is functioning well
- Walk back and forth between rooms to see all over the floor. If it is wooden floor, see if there are any areas that are peeled or not evenly paved. If it is a tile floor, see if it is scratched, dirty or chipped
Most of the experience in receiving the hand-over on behalf of Realtique’s clients, the above factors are guaranteed by the developers, but sometimes errors are unavoidable such as: dirty stone surface, painting that still needs the sanding or with holes, small chipped wall on a side… Most developers support on-site repair or complete in the next 1-2 days for residents to comfortably receive the apartment/house.
3/ The last step: will be to record the electricity and water indicators, receive welcome gifts from the developer, take souvenir pictures, sign hand-over documents and enjoy a ready apartment/house.
4/ After the date of hand-over: all details about the apartment/house repair are still supported by the developer, but there will be a pre-check step to check whether the problem comes from the developer or by the owner. If there is an external impact, not from the developer, the repairs and costs will be managed by the owner.
Checking the kitchen shelf on the day of hand-over
So, after receiving the hand-over, what next you can do?
- To use: if for using purpose, the next job will be interior decoration
- For rent: if for rent out, a quality furniture package that is durable over time and importantly, economically efficient will be needed
- For resell: simply keeping the apartment/house clean and tidy for customers to view
With the function of consulting throughout the life of a real estate, in addition to consulting on buying new projects, listing the units for sale/lease, Realtique also participates in interior supply and real estate management steps.
With a professional team, focusing on key design and quality, Realtique has provided comprehensive interior packages for projects such as Empire City, Sunwah Pearl, One Verandah, Estella Heights. All are successful, meeting the owner’s expectations and easily renting out after completion.
Realtique’s interior making process:
1/ Quotation step: take measurements to have the most accurate dimensions, provide the most suitable interior models.
Measurement ensures the choice of furniture that is suitable for the space and use, avoids inappropriate size and model. If the quotation is based on a wrong measurements, this will get to inaccurate furniture size that does not fit, leading to changes in the construction process
2/ Interior options proposal: based on discussions with the owners about budget, design style, Realtique will complete the proposal and send the most accurate quotation to owners to decide. This only takes a few days.
3/ Construction: Since the entire interior is tailored made and everything is quality guaranteed, it will take 21 days from preparation, production to final finishing.
Realtique interior package always comes with a 12-month guaranteed quality and warranty period
Before and after finishing the interior furnishing for rent at Sunwah Pearl:
Bring a home feeling to your kitchen
Some other images from the views in the living room of the apartment at Sunwah Pearl and One Verandah:
Most of the apartments, after the interior, are very suitable for both owners and the tenants
Some other projects Realtique is implementing in Empire City, 2 bedroom apartments in Linden Residences:
The layout of the furniture in the dining room
The layout of the furniture in the living room
Sofa is the most important feature of the living room
Small details like shoe cabinet and shoe wearing seat cannot be ignored
To receive assistance in the apartment/house hand-over and consulting in furnishing packages, please contact:
Email Support (24H): We know you will have a lot questions. Send us an email and we will get back to you within 1 working day.
Realtique Co., LTD
+84903186378 (Whatsapp/Viber/Zalo/Wechat)